Trane enables Pritech Park achieve ‘LEED Platinum’ certification
March 10, 2014 10:15 am
A case study on how Trane, one of the leading global providers of indoor comfort solutions and services, helps ‘Pritech Park SEZ’ Bangalore become an LEED Platinum certified facility
Trane has deployed high-efficiency heating, ventilation and air conditioning (HVAC) systems at Pritech Park – SEZ, Bangalore, which is an approved and notified multi-tenant IT/ITES/hardware SEZ and home to many renowned international business/IT companies. Pritech Park – SEZ is established by RGA Software Systems Pvt. Ltd., which was incorporated in the year 2000 with an aim to develop infrastructure facilities for the IT Industry.
ChallengeThe Pritech Park developers had challenging expectations from HVAC systems manufacturers in terms of energy efficiency, indoor air quality and reliability. With a diverse set of tenants and varied work hours, they sought to accommodate the individual comfort needs of the occupants. In addition, they wanted to bring down the operating and service costs.
Solution Based on a thorough understanding of the infrastructure needs and health, safety and environmental requirements, the Trane team proposed the best solution to maximise comfort, efficiency and savings. Trane recommended air-cooled screw chillers, centrifugal chillers and Tracer Summit chiller plant manager at Pritech Park – SEZ. All chillers were covered under the Trane select service contracts.
The CenTraVac centrifugal chiller also has the lowest total refrigerant emissions rate in the industry. Ensuring tenant comfort controls with easy-to-navigate touch screens and displays allow RGA engineers to monitor the equipment and make adjustments as necessary. The Tracer Summit chiller plant manager is an intelligent plant management system with specific control strategies to optimise overall chiller plant energy efficiency and reliability while providing predictive maintenance control.
Result Pritech Park –SEZ is benefiting from maximum system efficiency, simplified maintenance, lower overall operating costs and improved indoor comfort levels for occupants with commensurate health and productivity benefits, which would result in fast payback and return on investment.
Systems deployed in Phase I and II have been interconnected and either of the plant managers can take care of the building loads. Since the highly efficient Centravac chillers run most of the time, the total energy cost for the buildings has been low.
To achieve LEED certification, the project met strict requirements regarding sustainable sites, water efficiency and atmosphere, materials and resources, indoor environment quality and innovation in design. Trane has played a significant role in creating Pritech Park as a high-performance green building that is healthy, productive place to work; is less costly to operate and maintain; and has reduced environmental impact. Pritech Park has been awarded ‘LEED Platinum’ core and Shell by IGBC.
Project DetailsProject segmentationSector specific SEZ (IT/ITES/ hardware)
Development phasesTwo phased development
Project areaLand area – 37 acresPhase I: 16 acresPhase II: 21 acresBuilt-up area – 5 mn sq. ft.
Project amenitiesRetail block, food court, ATMs, cafeteria, auditorium, gym, healthcare centre, creche
LocationSarjapur- Outer Ring Road, Belandur, Bangalore
Systems InstalledPhase I Development10 Trane Air cooled screw chillers (350TR each)3 Trane Water cooled centrifugal chillers (700TR each)Trane Tracer Summit Chiller Plant ManagerAnnual Maintenance Contract
Phase II Development3 Trane Centravac chillers (1400 TR each)Trane Tracer Summit Chiller Plant Manager1 Trane Water cooled centrifugal chillers (700TR)
Cookie Consent
We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.